Case Study

Wakefield Fire Station

Site Wide Connectivity Improvement Project

Wakefield Fire Station - Solution

Background

Wakefield Fire Station is a 26,000ft2, £2.9m fire station project, scheduled to open in August 2020.

The site is made of multiple buildings, all requiring signal improvements for operational purposes, health and safety, emergency business continuity and cross-service communications.

The Solution

Boost Pro managed the full process from start to finish. This included initial requirements gathering, design survey and professional installation by our certified engineers.

EE, the Fire Services preferred network, has gone from zero signal to a full 5 bars.

As this project was implemented during the construction phase, we were able to ensure that the equipment was installed in the best possible locations on the site, for maximum signal gain and minimal disruption to site operations.

Can we help? Get in touch

Email: connect@boostprosystems.com

Tel: 0330 1244 805

19 Shairps Business Park, Livingston, West Lothian, EH54 5FD

Boost Pro Systems

Formed in 2014, Boost Pro Systems is the industry leader in solving the problem of dropped calls, poor voice quality and low data throughput caused by weak cellular signal.caused by a weak cellular signal.