– A survey was carried out to create a heat map showcasing the areas within the hospital that suffer from poor signal strength.
– The survey also revealed that despite the city centre location of the building, the modern and sustainable building materials used during construction prevented mobile signal from penetrating the lower parts of the building.
– It also confirmed that there was sufficient external signal that a working solution could be deployed.
– A consultation period with the hospital and Vinci Facilities Management then followed, with Boost Pro designing a system of 8 Network Units and 28 Coverage Units throughout the levels M3, M2, M1 and Level 0.