Background
Wakefield Fire Station is a 26,000ft2, £2.9m fire station project, scheduled to open in August 2020.
The site is made of multiple buildings, all requiring signal improvements for operational purposes, health and safety, emergency business continuity and cross-service communications.
The Solution
Boost Pro managed the full process from start to finish. This included initial requirements gathering, design survey and professional installation by our certified engineers.
EE, the Fire Services preferred network, has gone from zero signal to a full 5 bars.
As this project was implemented during the construction phase, we were able to ensure that the equipment was installed in the best possible locations on the site, for maximum signal gain and minimal disruption to site operations.