Case Study

Landis+Gyr, Manchester

Site Wide Connectivity Improvement Project

Landis+Gyr, Manchester

Landis+Gyr is an industry leader in energy management solutions. With a new office opening in Manchester in 2020, Boost Pro were approached to provide a solution to improve mobile signal strength in the building.

landisGyr
Image credit: Landis & Gyr - https://www.landisgyr.eu/

The Solution

The new office covers 18,708 sq ft over two floors, with mobile signal improvements key to operations, health and safety, business continuity and staff and client communication.

Boost Pro managed the full process from start to finish. This included initial requirements gathering, design survey and professional installation by certified our engineers.

All four UK carriers – O2, EE, Vodafone and Three – have gone from little to no signal, to a full five bars across both floors in the office.

Can we help? Get in touch

connect@boostprosystems.com

Tel: 0330 1244 805

19 Shairps Business Park, Livingston, West Lothian, EH54 5FD

Boost Pro Systems

Formed in 2014, Boost Pro Systems is the industry leader in solving the problem of dropped calls, poor voice quality and low data throughput caused by weak cellular signal.caused by a weak cellular signal.

Scroll to Top