Due to the design of the EICC (as is common with many new buildings) the mobile signal is very strong outside the centre, but very weak inside.
The EICC tasked us to improve the EE signal within the Lennox Suite, the main event area within the conference centre. The Lennox Suite suffered from zero signal due to being below ground level.